The Pilbara project is located 120 kilometers outside the Port of Headland, Western Australia, and is one of the largest spodumene deposits in the world. The project's mineral resources are approximately 8.71 million tons of LCE, which has been put into operation since the second half of 2018.
Mineral Resources(2017) |
|||
Category |
Lithium concentrate |
li2O |
Grade |
Measured |
17.6 |
244,000 |
1.39 |
Indicated |
77.7 |
1,017,000 |
1.31 |
Inferred |
61.1 |
691,000 |
1.13 |
Total |
156.3 |
1,925,000 |
1.25 |
The deposit project is close to main roads, airports and Port Hedland; due to mineralization, spodumene ore can be mined in the open air with high efficiency and low cost.
The company holds a 6.16% stake in Pilbara